Concrete Bag Calculator

Counting bags for a small pour — not paying a truck minimum?

Longest side of the pad or footing.
Shortest side.
Patio pads 4 in; shed slabs 4-5 in; footings per code.
10% covers spillage and uneven mixing — do not cut this one short on a pour you cannot pause.
80 lb bags at ~$6 each work out to roughly $180-270 per yard — enter your effective rate.
—80 lb bags
60 lb bags—
40 lb bags—
Exact volume (yd³)—
Volume with waste (yd³)—
Estimated cost at your rate (USD)—

How this is calculated

  1. Volume in cubic feet = length × width × (depth ÷ 12)
  2. Order volume = volume × (1 + waste % ÷ 100)
  3. Bags = ⌈order volume ÷ bag yield⌉ — 80 lb yields 0.60 cu ft, 60 lb yields 0.45, 40 lb yields 0.30 of mixed concrete

Common questions

How many 80 lb bags of concrete for a 4×4 slab?

A 4 × 4 pad at 4 inches is 5.33 cu ft; with 10% waste, call it 10-11 eighty-pound bags. That is a one-person, one-mixer, half-day job — and right at the comfortable limit of hand-mixing before a ready-mix short load becomes the smarter call.

How much does one 80 lb bag of concrete make?

0.60 cubic feet of mixed concrete — a little under two gallons short of a 5-gallon bucket... in practice, one 80 lb bag fills a 12 × 12 × 6 in form with a bit left. Rule of thumb: 45 bags per cubic yard, which is why the math tips toward delivery fast.

When should I stop using bags and order ready-mix?

Around 1 cubic yard (45+ eighty-pound bags), the numbers flip: bagged concrete works out to $180-270/yd³ versus $125-200 for delivered ready-mix — plus about 20 hours of shoveling you do not do. Under a yard, bags still win because trucks have minimum charges.

Can I mix bagged concrete by hand?

Yes, but keep batches small: one 80 lb bag per wheelbarrow mix, water measured to the bag's spec (start with ~3 quarts), and mix it to oatmeal-not-soup consistency. Concrete starts setting 30-60 minutes after water hits it, so stage forms, tools, and a helper before you open the first bag.

What about fast-setting concrete?

Fast-setting (like the red-bag products) is for post setting and repairs, not slabs — it grabs in 15-30 minutes, which is great for a fence post and terrible when you are trying to screed a pad. Regular 80 lb bags reach walking strength in a day or two and full cure in about a week; keep it damp the first few days for maximum strength.